Page 32 - Sinergia_53_EN
P. 32

EUROPE
GLAN AGUA UK WINS CONTRACT OF
£30 MILLION
THE WORKS WILL GUARANTEE THE SUPPLY OF QUALITY WATER TO OVER 3.5 MILLION CUSTOMERS AND ENSURE THAT THERE IS NO DISRUPTION TO THE CONSTRUCTION OF THE £56 BILLION HIGH SPEED RAIL (HS2) PROJECT.
32
G lan Agua and their JV partners, Farrans Construction, has
recently been awarded Lots
2 and 3 of the HS2 Process and Network
Modi cations Frameworks for A nity Water, with a total estimated value
of £30 million.
This marks another signi cant step for Glan Agua and MOTA‐ENGIL in their ambitions for the UK market. HS2 is the proposed new high‐speed rail link from London to
Birmingham and beyond, which will bisect A nity Water's supply area.
The framework will provide crucial upgrades of existing treatment infrastructure to facilitate the construction of HS2.
The Lot 2 works will require the design and installation of modi cations of up to  ve treatment sites, primarily to deal with the risk of increased levels
of chalk turbidity as a result of HS2
TECHNICAL INFORMATION
ESTIMATED VALUE:
£30 million
CAPACITY UPGRADES:
20 million litres per day
REPLACEMENT OF DUCTS:
4.5 km
CONTRACT TYPE:
NEC3 PSC (Framework)
IChemE Red Book (Lot 2 Design /Build)
NEC3 EEC (Lot 3 Design / Build)
MAINTENANCE PERIOD:
5 years
ENGLAND


































































































   30   31   32   33   34